Wuxi JEIO Chemical Machinery Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Wang Hui
  • Company Name : Wuxi JEIO Chemical Machinery Co., Ltd.
  • Tel : 86-510-85950865,13706185292
  • Fax : 86-510-85950802
  • Address : Jiangsu,Wuxi City,NO.5 Nanquan Industry garden B area of Binhu area, Wuxi
  • Country/Region : China
  • Zip : 214128

freah water cooling tower

freah water cooling tower
Product Detailed
Related Categories:Other Chemical Equipment
1.Mass transfer, heat transfer effect is good 2.Containment performance is good, easy to operate 3.Gas liquid load is high

About us

  We specialized in designing and manufacturing different kinds of towers in china with the experience of more than 15 years,We have sucessfully reached many deals with some of the Asian countries.We help our customer develop special towers for their application and OEM service offered. Your visit will be specially welcomed.

About the product

1.Feature:

(1).Mass transfer, heat transfer effect is good(2).Containment performance is good, easy to operate(3).Gas liquid load is high, the entrainment less

(4).Plate pressure drop, small resistance system

(5).Dust, absorption performance is good, can reach more than 98%2.Working principle

(1).Gas go into the machine in the tangential direction from the bottom of the tower,going up spirally with the guide of the plate blade.The liquid is assigned to each blade to from thin layer and be spraied into droplet at the same time.

(2).The droplet is left to the tower wall by centrifugal force with airflow movement to form the wall rotating liquid ring,along to ring set liquid tank by the action of gravity,again through the overflow device to the next blind plate which is then gush into droplets.

(3).The droplet spin with the air flow,the centrifugal force it produce strenghthen the contact between air and liquid.The liquid is left to the tower wall with the dust paticle.

3. scope of application

Electric power, chemical, mining and metallurgy, light industry and other industries flue gas desulfurization du st and other industrial waste gas treatment4. Product maintenance

(1). The lifting equipment should be smooth landing, and shall not suffer

(2). installation requirements smooth solid, minus its requirements vertical, in wind large areas, tower body should be strengthen(3). And equipment connection pipe should avoid all the weight function in the device's takeover, top discharge connection should be fixed(4). the pipe and pipe connection recommends installation compensator

(5). When driving should be start absorption liquid pump, open fan, normal operation before enter the system(6). should adjust pump flow when System is running

(7). Pay attention to bottom water level, prevent the liquid into the duct(8). To prevent debris into the tower in jams

(9). Such as medium toughness or fallout attached on the tower, cause the treatment effect is reduced, can raval flange to clean blade.

freah water cooling tower



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.