- Mixing Equipment[1]
- Other Industrial Filtration Equipment[1]
- Heat Transfer Equipment[1]
- Heat Exchanger[2]
- Refrigeration Equipment[1]
- Chemical Auxiliary Agent[1]
- Chemical Product Machinery[2]
- Reactors[1]
- Chemical Storage Equipment[2]
- Other Pharmaceutical Machinery[1]
- Boiler Parts[1]
- Other Chemical Equipment[1]
- Contact Person : Mr. Wang Hui
- Company Name : Wuxi JEIO Chemical Machinery Co., Ltd.
- Tel : 86-510-85950865,13706185292
- Fax : 86-510-85950802
- Address : Jiangsu,Wuxi City,NO.5 Nanquan Industry garden B area of Binhu area, Wuxi
- Country/Region : China
- Zip : 214128
evaporative fluid cooler
About us
We specialized in designing and manufacturing different kinds of coolers in china with the experience of more than 15 years,We have sucessfully reached many deals with some of the Asian countries.We help our customer develop special coolers for their application and OEM service offered. Your visit will be specially welcomed.
About the product
1.Material avilable:stainless steel,titanium steel
2.Size:heat aera 15.2m2,weight 700kg
3.Product feature:
small apperance,easy to site layout and installation
4.Quality standard:
Standard of product: GB151-1999
license level: A2
license code:Ts2210788-2012
5.Method of use:
Procedure(1).
Make sure the cooler has passed the press test before revamping while emptying the intenal water.
Procedure(2):
Check if the fall tube, emptying valve is flexible to use and if switch position, pressure gauge, thermometer all good.
Procedure(3):
Check if the oundation, support firm and if each bolt fastening.
Procedure(4):
first throw cold flow, then throw heat flow when ravamping.
Procedure(5):
Ensure he subline clear then slowly open outlet valve after no problem of checking and prevent pressure-out.
Pay attention to hange of equipment.Ater revamping, along with the temperature and pressure changes, may appear leakage phenomenon, should check in time.
6.scope of application
Used for high power silicon rectifier and induction furnace and intermediate frequency furnace etc,as the coling device of pure wate,water-wind,water-oil and oil-wind for big electric equipment cooling protection machine.
7.Date of delivery
30 days
8.Product maintenance
1) check process parameters, it is strictly prohibited to overtemperature, overpressure operation. 2) to examine the slot, cauldron, interface flange for leaks.
3) to examine foundation support stable situation.
4) check cooler and pipeline vibration situation
5) check the product color and temp change after heat exchange.
evaporative fluid cooler